Connecting Our Communities

Gilman Springs Road Widening

Gilman Springs Road Shoulder Widening

Project Overview

Project Schedule

  • Environmental Clearance Phase: Summer 2022 (Complete)

  • Final Design: Spring 2024 (Completed)

  • Right of Way: Winter 2023 (Completed)

  • Construction Start: Summer 2024

  • Construction Completion: Early 2025

Public Hearing for Gilman Springs Shoulder and Median Widening Project Draft IS/MND

Description
This public hearing will provide an overview of the Gilman Springs Shoulder and Median Widening Project Draft IS/MND. This hearing will also provide an opportunity for project stakeholders and members of the public to provide comments on the Draft IS/MND. Public comments provided during the hearing will be documented and addressed in the Final IS/MND. The public hearing was held on March 31, 2022.

Limits: 1.7 miles south of Alessandro Blvd to 1 mile south of Bridge St
Length: approx. 4 miles
District: 5
Communities: Gilman Springs, Eden Hot Springs, Jackrabit Trail, Laborde Canyon

☎  Project CONTACT

Jan Bulinski
(951) 955-6859 Office

Alfredo Martinez, Project Manager
(951) 955-0086
almartin@rivco.org

The proposed improvements include pavement widening to accommodate 4’ painted median with centerline rumble stripes, 6’ paved shoulders, providing approximately 1 mile of Northbound passing lane, extending existing culverts, and regrading shoulders and slope edges.

Phase 6 Anticipated Construction Start: Summer 2024
Phase 6 Anticipated Construction End: Early 2025

Estimated Project Cost: $18 million

The Draft Initial Study with Proposed Mitigated Negative Declaration (MND) for the Gilman Springs Shoulder and Median Widening Project will be available March 11 through April 12, 2022. The document will be available for review at the following locations:

 • County of Riverside Transportation Department, 3525 14th Street, Riverside, California 92501 (Monday – Thursday, 8:00 a.m. to 5:00 p.m.)

• County of Riverside Public Library, Nuview Library, 29990 Lakeview Ave, Nuevo, CA 92567 (During normal library hours)

• http://www.rcprojects.org/gilmanshldwidening

Public Notice (pdf)

Project Documents



the final Environmental Document as approved by the Board of Supervisors on Sept. 13, 2022

Final Approved NOD

Final Approved ISMND (Part 1)

Final Approved ISMND (Part 2)

TECHNICAL STUDIES

DBESP Part 1 (pdf)
DBESP Part 2 (pdf)
LOCATION HYDRAULIC STUDY AND SUMMARY FLOODPLAIN ENCROACHMENT REPORT
Natural Environment Study (Part 1)
Natural Environment Study (Part 2
Paleontological Records Search
Section 4F - DeMinimis Finding
WATER QUALITY MEMORANDUM


Project Photos