Connecting Our Communities

MacKay Dr. Sidewalk

MacKay Dr. Sidewalk

Project Overview

The County of Riverside Transportation Department is proposing to construct approximately 750 feet of new sidewalk along the south side of MacKay Dr from Marian Ave to Union Ave. This improvement will extend the limit of the existing sidewalk and will provide additional pedestrian path of travel to the adjacent Lakeland Village Community Center’s ballpark.  MacKay Dr is a two-lane road with width varying from 28 feet to 36 feet, and is classified as Local Road in the County of Riverside’s General Plan. In addition to new sidewalk construction, the proposed improvements will also widen a portion of roadway, resurface the remaining portion of existing pavement and accommodate curbside parking along MacKay Dr.

Additional Project Details

Limits: Marian Ave to Union Ave

Length: Approximately 750 feet (0.15 Mile)

District: 1

Community: Lakeland Village

The proposed project will also include:

·         Reconstruction of AC Dike

·         Reconstruction of PCC Cross Gutters and Spandrels

·         Construction of PCC Curb & Gutter

·         Construction of PCC Curb Ramp

·         Cold Plane remaining portion of Mackay Dr and abutting streets

·         Minor Slope Re-Grading

·         Utility water valve cover and sewer manhole adjustments

·         Partial striping and pavement markers

·         Salvage/removal of existing sign and installation of new signs


Project Photos 

Project Schedule

  • Environmental Phase Clearance: Sep 2023

  • Final Design: Oct 2023

  • Right of Way: N/A

  • Construction Start: Mar 2024

  • Construction End: May 2024

Project Documents