Construction Notice, Week of April 3-7, 2023, Clinton Keith Road Extension Project
Week of April 3-7, 2023 - Crews will continue working on the culvert, on the bridge structure & widen SR-79 lanes.
The proposed Clinton Keith Road from Leon Road to Winchester Road is continuing slow due to recent rain events and site conditions. The contractor is to resume, normal weather permitting, with planned construction activities such as French Valley Creek Bridge, installation of Arch Culverts, drainage systems, traffic signal systems, and the new roadway structure including Winchester Road widening. Note: Briggs Road from Leon Road to Los Alamos Road is permanently CLOSED.