Connecting Our Communities

News

Project News

Clinton Keith

The proposed Clinton Keith Road extension from Leon Road to Winchester Road is progressing as planned. The contractor is working on importing material for the roadway structure, building the concrete headwall of Arch Culverts, and concrete curb and sidewalk, traffic signal systems, and a new roadway structure including Winchester Road widening.  Note: Briggs Road from Leon Road to Los Alamos Road is permanently CLOSED.

Yvette Munoz