Chiraco Road & Summit Road Resurfacing
Limits: Chiriaco Road from Summit Road to 750 feet east of Summit Road, Summit Road from Chiriaco Road to Pinto Road
Length: Approximately 1650 feet (Chiriaco Road 750 feet and Summit Road 900 feet)
District: 4
Community: Chuckwalla
The County of Riverside Transportation Department proposes to resurface approximately 1650 feet of Chiriaco Road and Summit Road. Chiriaco Road and Summit Road are both classified as Local Roads in the County of Riverside General Plan. Chiriaco Road and Summit Road are two lane roads and are 32 feet wide each. The proposed improvements consist of removing the existing roadway and placing back Hot Mix Asphalt (HMA).
Additional improvements include:
Reconstruction of asphalt concrete dike, driveway, and apron
Striping of roadway, including pavement markers and reflectors
Salvage/removal and installation of new signs
No additional right-of-way or temporary construction easements will be required to construct the proposed improvement. The project improvements will not raise the existing roadway profile. Note: Caltrans Permit was needed for work being done adjacent to the bridge going over the I-10.
PROJECT SCHEDULE
Environmental Clearance: October 2017
Final Design: September 2017
Construction Start: April 2018
Construction Completion: May 2018