Chicago Avenue Reconstruction
Limits: Palm Avenue to Cedar Avenue
Length: Approximately 4,000 feet
District: 3
Community: Valle Vista
The County of Riverside Transportation Department is proposing to reconstruct approximately 4,000 feet of Chicago Avenue from Palm Avenue to Cedar Avenue. Chicago Avenue is classified as a local road in the County of Riverside’s General Plan. Chicago Avenue is a two lane road and currently ranges from 25-64 feet wide with curb/gutter along various segments of the roadway. The proposed project will include removing the roadway, treating the base and underlying material with cement, and placing back Hot Mix Asphalt (HMA) and Asphalt Rubber Hot Mix (ARHM).
The proposed project will also include:
Reconstruction of concrete curb/gutter, cross gutter, spandrel, and ADA deficient curb ramps
Construction of asphalt concrete overside drain
Replacement of corrugated metal pipe
Placement of safety edge and shoulder backing
Utility adjustments
Striping of roadway to include bike lanes and center median
Salvage/removal and installation of new signs
No additional right-of-way will be required to construct the proposed improvements. The project improvements will remain within the existing footprint of the roadway and will not raise the existing roadway profile.
PROJECT SCHEDULE
Environmental Clearance: July 2020
Final Design: February 2020
Construction Start: August 2020
Construction Completion: August 2020