Corkill Road Resurfacing
Limits: Dillon Road to half a mile south of Dillon Road
Length: Approximately 2,600 feet
District: 4
Community: Desert Edge
The County of Riverside Transportation Department is proposing to resurface approximately 2,600 feet of Corkill Road from Dillon Road to half a mile south of Dillon Road. Corkill Road is classified as a Local Street in the County of Riverside’s General Plan. Corkill Road currently ranges from 23-57 feet wide with curb/gutter along various segments of the roadway. The proposed project will include removing the roadway and placing back Hot Mix Asphalt (HMA).
The proposed project will also include:
Replacement of some curb/gutter
Improvements to existing drainage conditions
Placement of safety edge and shoulder backing
Utility adjustments
Salvage/removal and installation of new signs
Striping of roadway, including pavement markers and reflectors
No additional right-of-way will be required to construct the proposed improvements. The project improvements will remain within the existing footprint of the roadway.
PROJECT SCHEDULE
Environmental Clearance: November 2019
Final Design: October 2019
Construction Start: May 2020
Construction Completion: June 2020