Tyler Street Resurfacing

 Limits: Airport Boulevard to 54th Avenue
Length:  Approximately 1 mile
District: 4
Community: Thermal

The County of Riverside Transportation Department proposes to resurface approximately 1 mile of Tyler Street from Airport Boulevard to 54th Avenue. Tyler Street is classified as a Major Road in the County of Riverside General Plan. Tyler Street is a two lane road that varies from 26-49 feet wide with curb/gutter at various segments of the roadway. The proposed improvements consist of Cold-in-Place Recycling (CIR) the roadway and overlaying with Hot Mix Asphalt (HMA).

Additional improvements include:

  • Reconstruction of asphalt concrete driveway

  • Placement of safety edge and shoulder backing

  • Utility adjustments

  • Striping of roadway, including pavement markers and reflectors

  • Salvage/removal and installation of new signs

No additional right-of-way or temporary construction easements will be required to construct the proposed improvements. The project improvements will raise the existing roadway profile by 0.25 feet.

PROJECT SCHEDULE

Environmental Clearance: October 2017
Final Design: September 2017
Construction Start: March 2018
Construction Completion: April 2018