Clinton Keith Road - Weekly Status and Video

The proposed Clinton Keith Road from Leon Road to Winchester Road is continuing with post construction erosion control, guard railing systems, concrete headwall and dip-crossing, minor concrete work, and traffic signal systems. The contractor is scheduled to remove and replace asphalt pavement at Leon Road/Clinton Keith Road and pave new asphalt (top layer) on the new proposed Clinton Keith Road next week. Please observe construction warning signs and use caution while travelling through the work zone. Thank you for your patience and understanding!

Note: Briggs Road from Leon Road to Los Alamos Road is permanently CLOSED (NO ACCESS).”

Clinton Keith Road - Weekly Status and Video

The proposed Clinton Keith Road project is continuing with post construction erosion control, guard railing systems, concrete headwall, dip-crossing, minor concrete work, and traffic signal systems. The contractor is scheduled to install new asphalt pavement (top layer) on December 12, 2023. Thank you for your patience and understanding!

Note: Briggs Road from Leon Road to Los Alamos Road is permanently CLOSED (NO ACCESS).


Slurry Seal Schedule FY23-24 District 1 and 2 | Week of 12/5 - 12/10

The contractor is scheduled to apply slurry seal coat to various streets in the Temescal Valley, La Cresta (Clinton Keith Road), and Woodcrest areas. Please expect delays and use caution while travelling through the work areas. Please DO NOT drive over wet slurry seal material.

Thank you for your patience and understanding!

Steven Grayslurryseal
ALERT - ROAD WORK ON DILLON ROAD @ PALM DRIVE 11/29-12/4

NOTICE:

ROAD WORK ON DILLON ROAD @ PALM DRIVE

 

** Road work to begin Thursday November 29th, 2023 thru Monday December 4th, 2023, except on weekends **

Project Lead Agency: City of Desert Hot Springs

Reduced lanes for installation of utilities, expect delays.

See attached Traffic Control Plan

FOR FURTHER INFORMATION, PLEASE CALL DESERT OFFICE AT (760) 863-8267

Steven Gray
Idyllwild Resurfacing Project FINAL UPDATE!

Thanks for your patience during the County of Riverside Transportation Department’s Roadway Resurfacing Project!

This project included pavement rehabilitation on nearly 5 miles of roadway in Idyllwild on 4 different streets.

It also resurfaced the County Maintenance Yard and Lawler Park 8 miles north of Idyllwild; completed roadway repairs on Fern Valley Road; added asphalt curbs and adjusted manholes.

Steven GrayIdyllwild
Clinton Keith Road - Weekly Status Update and Video

The proposed Clinton Keith Road from Leon Road to Winchester Road is continuing with drainage systems, concrete (curb & median), soil stabilization, and traffic signal systems. Thank you for your patience and understanding!

Note: Briggs Road from Leon Road to Los Alamos Road is permanently CLOSED (NO ACCESS).

Embed Block
Add an embed URL or code. Learn more
Jurupa Grade Separation Project - Week of November 20

Week of November 20

#JurupaGradeSeparationProject

TRAFFIC IMPACTS

FELSPAR STREET

MONDAY - WEDNESDAY

6 a.m. - 5 p.m.

Lane closures

Traffic flaggers to assist motorists through the construction zone with parking restrictions.

BUSINESS ACCESS REMAINS OPEN

LUNES a MIERCOLES

6 a.m. - 5 p.m.

Cierres de carriles

Señalizadores de tráfico para ayudar al tráfico a través de la zona de construcción, restricciones de estacionamiento

EL ACCESO EMPRESARIAL PERMANECE ABIERTO

Jurupa Road

Felspar Street

Pedley Road

BUSINESS ACCESS REMAINS OPEN

>USE JURUPA RD. DETOURS<

Van Buren Blvd. to Rutile St. to Galena St. to Felspar St.

OR Van Buren Blvd. to Limonite Ave. to Pedley Rd. to Jurupa Rd.

#CleanersPlus

#DoninosJV

@donut_tyme_jv -->DONUTS and MORE!

@drtoothdentalandortho

@elcorralbajagrillinc

@familydiscount.jurupa

#FMIRealtyServices

#HiDefInc

#JackintheBoxJV

@jdmissionsteakhousejv

#LuckyWokJV

#MariesBeautySalon

#MetrobyTMobileJV

#MomiasNursery

#PanaderiaJaliscoBakery

@pizzakingjurupa

@plazaliquor1 >>Lucky Lottery Location

@ southridgecycling

#StateFarmTroyManning

#StaterBrosJV

#SubwayJV

#TitosSmogCheckStarStation

#YourHairCenter

Jurupa Road & Rutile Street

BUSINESS ACCESS REMAINS OPEN

>USE JURUPA RD. DETOURS<

Van Buren Blvd. to Jurupa Connector Rd.

OR use Rutile St.

#ArmandosRadiatorandMuffler

#JurupaDairyandGasPropaneRefill

@perezmarket_est1994

Steven GrayJurupaGrade
Hamner Ave. Week of Nov. 20 - Construction Update

#HamnerAveProject

 

PROJECT PROGRESS

Crews continue to work on eastern span bridge interior construction with a concrete placement scheduled for Dec. 1. Construction throughout the project area continues.

 

REDUCE SPEED to 35 mph in the project area, watch for crews working on the shoulder from Detroit Street to Citrus Street and along the length of the bridge. 

 

PEDESTRIAN ACCESS available on the western side of Hamner Avenue from Schleisman Road to the southern crosswalk at Citrus Street. 

 

NO PEDESTRIAN ACCESS ACROSS THE BRIDGE in this phase of the project. 

 

PLEASE USE RTA @riversidetransit Route003

Bus stops at 

Taft Street and Hamner Avenue (northbound)

AND

Citrus Street west of Hamner Avenue (southbound)

Please visit riversidetransit.com for route specific information.

 

SUBSCRIBE at http://www.hamneraveproject.com/updates/ 

 

STAY CONNECTED on IG @hamneraveproject and on FB @Hamner Avenue Bridge and Widening Project

Steven GrayHamner
La Cresta Area Striping Removal Schedule and Map

La Cresta Area Striping Removal Schedule and Map