Starting June 28, 2022, the contractor is scheduled to “Permanently Closed” Briggs Road from Leon Road to Los Alamos for the construction of new Clinton Keith Road. Los Alamos Road from Menifee Road to Briggs Road is access for local traffic/residents and emergency vehicles ONLY. We are also working on new alignment for Briggs Road from Los Alamos Road to Porth Road and Winchester Road. Please follow detour signage and thank you for your understanding.
We are starting the construction of new proposed sidewalk along El Toro Road and Dexter Avenue towards City of Lake Elsinore limits. The contractor completed the curb ramps replacement front of Temescal Canyon High School. The contractor is currently removing existing asphalt pavement and ground along the west side of Dexter Avenue from El Toro Road to Costco shopping center. Please use caution while travelling on Dexter Avenue because of “Open Trench” along the shoulder.
We are starting the reconstruction of San Jacinto Ave from Florida Avenue to Thornton Avenue in Hemet area. The contractor is currently removing and replacing concrete Curb Ramps, Spandrels, Cross-Gutters, and Curb & Gutter along San Jacinto Avenue. Please use caution and observe construction warning signs while travelling through this area. Thank you for your understanding and patience.
We are currently applying slurry seal to various streets in the Woodcrest and La Sierra areas. Please observe “No Parking” signs posted with the date of operation. Also, please do not drive over wet slurry and wait for the contractor to open the street as soon as the new slurry seal material dried for traffic.
We are scheduled to install Pavement Markings on Leon Road from Jean Nicholas Road to Briggs Road and on Max Gilliss Blvd. this week. Thank you for your patience! The construction of new proposed Clinton Keith Road from Leon Road to Winchester Road is progressing as scheduled. Currently, the contractor is working on the construction of a new bridge and earthwork.
The contractor is scheduled to install all Thermoplastic Pavement Markings on Leon Road from Jean Nicholas Road to Max Gilliss Blvd. and on Max Gilliss Blvd. There will be lane closures, please use caution while travelling through this area. For Clinton Keith Road: The contractor is continuing the construction of a new proposed bridge crossing French Valley Creek.duled to install all Thermoplastic Pavement Markings on Leon Road from Jean Nicholas Road to Max Gilliss Blvd. and on Max Gilliss Blvd. There will be lane closures, please use caution while travelling through this area. For Clinton Keith Road: The contractor is continuing the construction of a new proposed bridge crossing French Valley Creek.
Continue Briggs Rd realignment.
Continue retaining wall construction.
Construct abutment footings.
Pile driving for bridge foundation: Ongoing
For more project information, please visit www.clintonkeithphase3.org
We are currently applying new asphalt surface treatment (slurry seal) in the Woodcrest area of County of Riverside. Please observe “NO PARKING” signs posted with the date of slurry seal operation. Please plan on no parking or driving on these streets until the slurry material dried and the roadway is opened. For more information, please visit us on Facebook, and Twitter @RivcoTrans.
The new proposed traffic signal system on Washington Street at Saddleback Road is fully functional as of May 19, 2022. The contractor is continuing with minor repair, other improvements, and clean up the project site. Please use caution while travelling on Washington Street at Saddleback Road due to new traffic patterns associated with new improvements.
We completed all slurry seal application to proposed streets in District 3 including Temecula, French Valley, Winchester, Hemet, Romoland, and Homeland areas. The contractor is scheduled to install traffic stripe and pavement markings as soon as possible. The contractor is still working on concrete curb ramps replacement at various areas in District 3. Please use caution while travelling through construction zone.
We are currently replacing wiring for new proposed Video Detection system to all Traffic Signals on Leon Road from Jean Nicholas/Baxter to Max Gilliss Blvd. in the French Valley area. The contractor is also scheduled to complete Pavement Delineations on Leon Road and Max Gilliss Blvd. next week. Lane closure and brief power outage for traffic signal system are expected during working hours. Please continue use caution while travelling through this area. Thank you for your patience and understanding.
For new proposed Clinton Keith Road from Leon Road to Winchester Road/Benton Road: The contractor is continuing with the construction of proposed Bridge over French Valley Creek.
To minimize traffic impacts during regular weekday commute hours, our contractor is scheduled to work on Cajalco Road from Wood Road to Gustin Road in the Mead Valley & Lake Matthews area this Saturday, May 21, 2022. Working hours are from 7:00 AM to 5:00 PM. Crack sealing operations shall be controlled by flaggers. Please use caution and observe construction warning signs while travelling through this area. Thank you for your patience and understanding.
The contractor and technical support staff are turning on the new proposed Traffic Signal on Washington Street at Saddleback Road today (May 17, 2022) in the Woodcrest area. The contractor is continuing to do some minor work and clean up. Please use caution while travelling through due to changes at this new signalized intersection. Thank you for your patience.
We completed the proposed sidewalk, surface drainage structures, roadside signs, and fences & gates adjustment in the Carver Tract area. Contractor is waiting for material to construct a underground storm water detention basin on Luzon Street. Tentative schedule for this work is in July 2022.
We are replacing electrical wiring for a new traffic signal video detection system on Leon Road from Jean Nicholas Road to Briggs Rd./Max Gilliss Blvd. During construction, the signal system will be off and the intersection will be an “ALL WAY” STOP. Please use caution and expect delays while approaching the intersection under construction.
Schedule is as follows:
Thursday 5/12 – Leon at Jean Nicholas (completed)
Friday 5/13 – Leon at Lantana
Monday, 5/16 – Leon at Penny Cress
Tuesday, 5/17 – Leon at Briggs/Max Gilliss
For newly proposed Clinton Keith Road from Leon Road to Winchester Road/Benton Road: The contractor is currently working on the construction of a Bridge and associated facilities in the middle of the project limits.
To minimize the traffic impact during regular weekday travelling hours, the contractor is scheduled to crack sealing asphalt pavement on Washington Street from Van Buren Blvd. to Overlook Parkway in the Woodcrest area this Saturday, May 14. Traffic shall be reduced to ONE Lane/One direction and moved with the crack sealing operation, please observe warning signs and flagger’s instructions. Thank you for your understanding.