Clark St Resurfacing and Sidewalk - Weekly Status

Project suspension has been lifted, and the contractor is continuing to perform road improvements on Clark St from Martin St to Nandina Ave in the Mead Valley Community. The contractor will continue to close small segments of Clark St and detouring traffic between 7:00 AM and 6:00 PM in order to construct sidewalk and drainage systems between Martin St and Oleander Ave. Please observe construction detour and warning signs, use caution, and follow traffic control staff’s directions. Thank you for your patience and understanding.

Steven Grayclarkstreet
Good Hope Area and Theda Street - Weekly Status

We are continuing with the construction of new proposed sidewalk, cross-gutter, reconstructing asphalt pavement, and other improvements on Steele Peak Drive, Palm Street, Mountain Avenue, and Theda Street in Good Hope Community area.  Currently, the contractor is working on Steele Peak Drive. The roadway is narrow. Please slow down and observe construction warning signs while travelling through. Thank you for your patience and understanding.

Steven Gray
Pauba Road and De Luz Road - Weekly Status

Pauba Rd will continue to be closed until further notice between Via Del Monte and Mesa Verde Circle to allow crews to safely excavate the proposed retaining walls areas. Traffic detour route will follow Rancho California Rd. Please DO NOT ENTER “ROAD CLOSED” areas. Please use caution, observe construction warning signs and detour signs, and follow traffic staff’s directions. Thank you for your patience and understanding.


De Luz Road Culvert Replacement: Crews are continuing to replace multiple culverts on De Luz Rd. Roads will be reduced to one lane with flagging operations during working hours between Via Raquel and Carancho Rd. Please observe construction warning signs, use caution, and follow traffic control staff’s directions. Thank you for your patience and understanding.

Steven Graypauba
Jurupa Grade Separation - CONSTRUCTION ALERT - Week of June 23, 2025

Jurupa Grade Separation


CONSTRUCTION ALERT

Week of June 23, 2025



Single lane closures on northbound Van Buren Boulevard will continue over the next two weeks as crews deliver construction materials.



TRAFFIC IMPACTS:

• Monday through Friday

• 5 a.m. to 4 p.m.

• Outside lane closed on northbound Van Buren from north of Limonite Avenue to just south of Jurupa Road

• Expect traffic delays and watch for large trucks entering and exiting the area

• No lane closures planned on Friday, July 4, in observance of Independence Day



The intersection of Jurupa Road and Felspar Street remains closed for long-term construction. Please follow posted detours to move through the area safely.


Businesses remain open during construction! Access to shopping plazas along Felspar Street is available from both Jurupa Road and Felspar Street. Please support local businesses throughout the project.


This information may change due to weather or field conditions.


More info: www.JurupaGradeSeparation.com

Construction Hotline: 800-679-9570


Alerta de construcción disponible en español en jurupagradeseparation.com



#JurupaGradeSeparation #JurupaValley #JurupaValleyTraffic #SupportLocal #ShopLocal #BusinessesOpen #ShopLocalJV

Steven GrayJurupaGrade
Mecca Park & Greening Project - Weekly Status

We started the construction of Community of Mecca Park and Greening (planting trees) on 16 June 2025. The project is to plant about 175 new trees including associated irrigation system and to construct new proposed park at the corner of 2nd Ave, Hammond Rd. and 66th Ave. in the Community of Mecca. Estimated completion in September 2025 (with 90 days monitoring new plants). Please observe construction warning signs and use caution while travelling through the area. Thank you for your patience and understanding.


Note: Due to heat in this region, the contractor is authorized to start the workday at 5:00 AM.

Skyview Road Pedestrian Bridge - Weekly Status

We are continuing with the construction of Skyview Road Pedestrian Bridge over French Valley Channel in the Community of French Valley. The bridge will cross a gap along Skyview Road where there is no existing road crossing at French Valley Channel. The bridge will provide a path between the French Valley Library, located on the northwest side of the bridge, and the Susan LaVorgna Elementary School, located at the southeast corner of the intersection of Skyview Road and Via Santiago/Algarve Avenue. It will provide multipurpose access for both pedestrians and bicyclists, with no vehicular travel other than access for emergency vehicles.

The contractor is working on the falsework (temporary supporting structure for bridge construction).

Estimated completion: Summer 2026

No traffic impact. We will monitor and minimize construction noise to adjacent neighborhood. Thank you for your understanding.

De Portola Road Drainage - Weekly Status

We are continuing with the construction of the De Portola Road Drainage Improvements project between Shiraz Way and approximately 650 feet northerly in the Temecula Valley Wine Country area within the Community of Rancho California of Riverside County. Crews are continuing to work on new proposed decorative retaining wall. (Photo)


Note: There are multiple construction projects on De Portola Road (Rancho Water District, Eastern Municipal Water District, and County of Riverside). Please observe construction warning signs, follow traffic control staff’s directions, and use caution while travelling through. Thank you for your patience and understanding.

Steven Graydeportola
De Portola Road Drainage - Weekly Status

We are continuing with the construction of the De Portola Road Drainage Improvements project between Shiraz Way and approximately 650 feet northerly in the Temecula Valley Wine Country area within the Community of Rancho California of Riverside County. Crews are currently working on the new proposed decorative retaining wall.


Note: There are multiple construction projects on De Portola Road (Rancho Water District, Eastern Municipal Water District, and County of Riverside). Please observe construction warning signs, follow traffic control staff’s directions, and use caution while travelling through. Thank you for your patience and understanding.

Steven Graydeportola
Good Hope Area and Theda Street - Weekly Status

We are continuing with the construction of new proposed sidewalk, cross-gutter, reconstructing asphalt pavement, and other improvements on Steele Peak Drive, Palm Street, Mountain Avenue, and Theda Street in Good Hope Community area.  Currently, the contractor is working on Steele Peak Drive. The roadway is narrow. Please slow down and observe construction warning signs while travelling through. Thank you for your patience and understanding.

Steven Gray
Skyview Road Pedestrian Bridge - Weekly Status

We are continuing with the construction of Skyview Road Pedestrian Bridge over French Valley Channel in the Community of French Valley. The bridge will cross a gap along Skyview Road where there is no existing road crossing at French Valley Channel. The bridge will provide a path between the French Valley Library, located on the northwest side of the bridge, and the Susan LaVorgna Elementary School, located at the southeast corner of the intersection of Skyview Road and Via Santiago/Algarve Avenue. It will provide multipurpose access for both pedestrians and bicyclists, with no vehicular travel other than access for emergency vehicles.


The contractor completed the bridge substructure (supporting reinforced concrete columns). We have begun to erect falsework (temporary supporting structure for bridge construction).


Estimated completion: Summer 2026


No traffic impact. Will monitor and minimize construction noise to adjacent neighborhood. Thank you for your understanding.

Good Hope Area and Theda Street - Weekly Status

We are continuing with the construction of new proposed sidewalk, cross-gutter, reconstructing asphalt pavement, and other improvements on Steele Peak Drive, Palm Street, Mountain Avenue, and Theda Street in Good Hope Community area.  Currently, the contractor is working on Steele Peak Drive. The roadway is narrow. Please slow down and observe construction warning signs while travelling through. Thank you for your patience and understanding.

Steven Gray
De Portola Road Drainage - Weekly Status

We continue with the construction of the De Portola Road Drainage Improvements project between Shiraz Way and approximately 650 feet northerly in the Temecula Valley Wine Country area within the Community of Rancho California of Riverside County. Crews are currently working on a new proposed decorative retaining wall.

Note: There are multiple construction projects on De Portola Road (Rancho Water District, Eastern Municipal Water District, and County of Riverside). Please observe construction warning signs, follow traffic control staff’s directions, and use caution while traveling through. Thank you for your patience and understanding.

Steven Graydeportola