Connecting Our Communities

News

Project News

🌳Project Update - Mecca Neighborhood Park and Greening Project 🌳

Construction is moving forward at 2nd Ave, Hammond Rd, and 66th Ave! We're building a new park and planting 175 trees with an irrigation system to keep them thriving.


πŸ‘· Crews are working on sidewalks, curbs, grading, and irrigation across nearby streets.

🚧 Please follow construction signs and stay safe.

🚫 Do not enter the construction area.

Steven Gray
🚧 Project Update - Slurry Seal and Curb Ramp Accessibility Project πŸ›£οΈ

We’ve started our Slurry Seal & Curb Ramp Replacement Project across several streets in Riverside County. Work runs from August 4 to December 2025.


πŸ“ Current areas:


Nuevo (District 5)


Woodcrest (District 2) Crews are applying slurry seal, sealing cracks, and removing old striping.


πŸ“¬ Residents will get:


A notification letter


A door hanger


No Parking signs with exact work dates


⚠️ Please drive carefully, follow signs and traffic staff, and stay safe near work zones.


πŸ™ Thanks for your patience as we improve our roads!


rcprojects.com/slurryseal

Steven Grayslurryseal
🚧 Project Update - De Luz Rd Culvert Replacement 🚧

Crews are continuing work to replace multiple culverts on De Luz Rd between Via Raquel and Camaron Rd.


πŸ•˜ Working Hours: One-lane traffic with flaggers guiding vehicles.


Please:

⚠️ Watch for construction signs

πŸ‘·β€β™‚οΈ Follow traffic control staff

πŸ™ Drive safely & thank you for your patience!

Steven GrayDe Luz
🚧 Project Update - Pauba Rd 🚧

Work is temporarily suspended on Pauba Rd between Via Del Monte and Calle Contento.


πŸ—“οΈ Week of Sept 8: Crews will focus on clean-up and maintenance only.


Please:

⚠️ Use caution

🚧 Watch for construction signs

πŸ‘·β€β™‚οΈ Follow traffic control staff directions


πŸ™ Thanks for your patience and support!

Steven Graypauba
🚧 Project Update - Clark St Resurfacing and Sidewalk 🚧

Road improvements are happening on Clark St from Martin St to Nandina Ave.


πŸ•– Work Hours: 7 AM – 6 PM πŸš— One lane only during the day with flaggers guiding traffic.

Crews are paving driveways and backfilling.

Please:

⚠️ Follow detour signs

πŸ‘·β€β™‚οΈ Listen to traffic staff

πŸ™ Drive safely

Thanks for your patience!

🚧Project Update - North Shore/Desert Beach Resurfacing 🚧

Reconstruction is underway on:

πŸ›£οΈ 68th Ave., 70th Ave., 72nd Ave.

πŸ›£οΈ Bay Dr., Commerce St., Compass Dr.

πŸ›£οΈ Seaview Dr. & Vander Veer Rd.


πŸ“… Estimated completion: Nov–Dec 2025 πŸ—οΈ Crews are currently installing new concrete berms throughout the neighborhood to improve drainage and durability.


⚠️ Please follow posted construction signs and use caution when traveling through the area. Your safetyβ€”and our progressβ€”depends on it!


πŸ™ Thank you for your continued patience and support as we enhance our community’s infrastructure.

🌳Project Update - Mecca Neighborhood Park and Greening Project 🌳

🌳 Mecca Park & Greening Project Update 🌳 We’re making steady progress on the new park and tree planting initiative in the Community of Mecca! 🌱

πŸ“ Location: Corner of 2nd Ave, Hammond Rd & 66th Ave 🌲 175 new trees + irrigation system 🚧 Ongoing work includes: β€’ Curb & gutter construction β€’ Sidewalk installation β€’ Park area grading β€’ Irrigation setup across various streets

⚠️ Please observe all construction signs and use caution when traveling through the area. Your safety matters!

🌧️ Important Reminder: Due to recent rain, the construction zone is off-limits. Help us keep the site safe and on schedule.

πŸ™ Thank you for your continued patience and support as we build a greener, more vibrant Mecca!

🚧 Chip Seal Schedule - Sep 2-4🚧

Roadwork is underway between La Sierra and Woods from 9:00 AM to 5:00 PM daily. Expect delays of up to 10 minutes as crews manage traffic with a pilot car and flagging operation.

πŸ‘·β€β™€οΈ The contractor will maintain a 1-mile lane closure during active construction. Your patience helps keep everyone safe and the project moving smoothly!

πŸ“ Location: La Sierra to Woods

πŸ•˜ Hours: 9:00 AM – 5:00 PM

πŸš— Delay: Up to 10 minutes

⚠️ Traffic Control: Pilot car & flaggers

🚧 Roadwork Update – North Shore Area Resurfacing 🚧

We're making steady progress on the reconstruction of:

➑️ 68th Ave.

➑️ 70th Ave.

➑️ 72nd Ave.

➑️ Bay Dr.

➑️ Commerce St.

➑️ Compass Dr.

➑️ Seaview Dr.

➑️ Vander Veer Rd.


πŸ‘·β€β™‚οΈ Crews are currently installing a new concrete berm throughout the neighborhood to improve drainage and roadway durability.


πŸ“… Estimated completion: November–December 2025


⚠️ Please drive with caution and observe all posted construction signs while traveling through the area.


πŸ™ Thank you for your patience and continued support as we work to enhance our community infrastructure!

Steven Gray
🚧 Project Update - De Luz Rd 🚧

Crews are continuing work to replace multiple culverts along De Luz Rd. Expect one-lane traffic with flagging operations during working hours: πŸ“ Between Via Raquel & Carancho Rd πŸ“ At the intersection of De Luz Rd & Calle Capistrano


⚠️ Please drive carefully, follow posted signs, and respect our traffic control team. We appreciate your patience as we improve local infrastructure!

Steven GrayDe Luz
🚧 Project Update: Pauba Rd 🚧

Crews are hard at work improving Pauba Rd between Via Del Monte & Calle Contento. Throughout the week of August 25, expect progress on:

πŸ”§ Drainage systems

πŸ’§ Waterline connections

πŸ›£οΈ Pavement removal

πŸ“ Roadway grading


⚠️ Traffic Advisory: Pauba Rd will be reduced to one lane at multiple locations during working hours, with flagging operations in place. ⚠️


Please drive with caution, follow posted signs, and respect our traffic control team. πŸ™ Thank you for your patience as we build a better roadway for all!

Steven Graypauba
🚧 Project Update - Skyview Road Pedestrian Bridge 🚧

We’re making steady progress on the Skyview Road Pedestrian Bridge over the French Valley Channel in the Community of French Valley!


πŸŒ‰ This new bridge will span the current gap along Skyview Road, creating a vital connection between the French Valley Library πŸ“š (northwest side) and Susan LaVorgna Elementary School 🏫 (southeast corner of Skyview & Via Santiago/Algarve Ave).


πŸšΆβ€β™€οΈπŸš΄ Designed for pedestrians and bicyclists, the bridge will offer safe, multipurpose accessβ€”only emergency vehicles will be permitted.


πŸ”§ Crews are actively installing steel and formwork, and the project remains on schedule.


πŸ“ Heads-up: Concrete placement will begin in the next two weeks, once cooler temperatures allow. Exact date/time to be announced. We appreciate your patience and understanding!

Steven GraySkyview Bridge
🚧 Clark St Resurfacing and Sidewalk - Weekly Status 🚧

🚧 Clark St Resurfacing and Sidewalk - Weekly Status 🚧


Road improvements continue along Clark St from Martin St to Nandina Ave.


⚠️To keep the project moving safely, Clark St will be reduced to one lane during working hours (7:00 AM – 6:00 PM) with flagging operations in place. ⚠️


πŸ‘· Crews are performing backfill work behind sidewalks and curb ramps.


Please follow posted detour and warning signs and always heed directions from traffic control staff.


We appreciate your patience and understanding as we work to improve your community!

Steven Grayclarkstreet